9.15am to 9.40am
The development of a forty million pounds state of the art building is in many respects similar to a house extension; building contractors will select the easy, most convenient path. Break the live fibre. Use entry level items. Fix data points at builder convenient locations. If this sounds familiar then this talk may be of interest and relevance because, with the help of real-life examples, it details how Bangor University went from a chaotic unstructured and mixed environment to a standard installation model, this includes data rooms, wifi, open access rooms, CCTV, BMS, fibre, copper, etc. This was done by developing the IT Specification Document which contractors must adhere to. If they don't they will not be connected to the network
Speaker: Sim Barbaresi - Bangor University
View slides Listen to Audio Watch Video Close